Precautions for installation of pipelines in air separation tower

Precautions for installation of pipelines in air separation tower
Nov 14, 2022
Author: DEAR AST

The pipelines in the air separation tower work at low temperature, but their installation is carried out at normal temperature. Therefore, if the prestress is too large or the cold compensation is not good, it is easy to cause pipe cracking, valve jamming and other phenomena. In order to avoid this problem, the following points should be done during installation: when piping, generally, large pipes should be done first and then small ones, difficult pipes should be done first and then easy ones, small pipes should give way to large ones, and heat pipes should give way to cold pipes; Do not force the installation when the dislocation of the welding junction between the valve and the pipe is too large; For the installation welded junction at the flange connecting the valve and vessel, tighten the flange bolt without gasket before welding, and add gasket after welding; Avoid using small tubes and valve stems as scaffolds; Change the valve hanger into a rigid support.

The remote monitoring system for hazardous chemical production equipment independently developed by Kaifeng DEAR Air Separation Industry Co., Ltd. has been verified to be widely used in the production of intelligent air separation system based on Internet remote control and the manufacturing equipment for energy saving and environmental protection industrial gas. The research results include DCS system, data acquisition system, customer remote monitoring system and manufacturer remote monitoring system. Multiple customer monitoring terminals work at the same time, which is conducive to effective management and normal operation of users, and can find and handle problems in a timely manner. The monitoring terminals of multiple manufacturers can help manufacturers obtain real-time information and historical data of equipment operation, and provide users with timely and accurate technical support.

DEAR Air Separation Solve YourPrecautions for installation of pipelines in air separation towerYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Oxygen generators are switchable heat exchanger process oxygen generators and molecular sieve pressurised expansion process oxygen generators. The pure liquid nitrogen supplied to the upper tower is less and a stream of dirty liquid nitrogen can be pumped to the upper tower.   The oxygen generator of the pressurised expansion process, b...
2025.02.27
1.Before filling alumina and molecular sieve adsorbent into the adsorber, personnel should be arranged to enter the adsorber to check whether the screen screen is damaged. If there is any damage, it must be repaired before filling. 2.The quantity of adsorbent should be counted during loading and unloading, and the packing barrel and bag of adsorbent should be prevented from being damaged, and the adsorbent should be prevented from getting damp due to poor sealing. 3.The molecular sieve in the container should be filled in dry weather without rain. Personnel entering the container shall wear oil-free work clothes and caps and clean soft soled shoes.
2025.02.26
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top