当前位置: Home / Faq / Liquefied air separation FAQ /

Precautions for installation of pipelines in air separation tower

Precautions for installation of pipelines in air separation tower
Nov 14, 2022
Author: DEAR AST

The pipelines in the air separation tower work at low temperature, but their installation is carried out at normal temperature. Therefore, if the prestress is too large or the cold compensation is not good, it is easy to cause pipe cracking, valve jamming and other phenomena. In order to avoid this problem, the following points should be done during installation: when piping, generally, large pipes should be done first and then small ones, difficult pipes should be done first and then easy ones, small pipes should give way to large ones, and heat pipes should give way to cold pipes; Do not force the installation when the dislocation of the welding junction between the valve and the pipe is too large; For the installation welded junction at the flange connecting the valve and vessel, tighten the flange bolt without gasket before welding, and add gasket after welding; Avoid using small tubes and valve stems as scaffolds; Change the valve hanger into a rigid support.

The remote monitoring system for hazardous chemical production equipment independently developed by Kaifeng DEAR Air Separation Industry Co., Ltd. has been verified to be widely used in the production of intelligent air separation system based on Internet remote control and the manufacturing equipment for energy saving and environmental protection industrial gas. The research results include DCS system, data acquisition system, customer remote monitoring system and manufacturer remote monitoring system. Multiple customer monitoring terminals work at the same time, which is conducive to effective management and normal operation of users, and can find and handle problems in a timely manner. The monitoring terminals of multiple manufacturers can help manufacturers obtain real-time information and historical data of equipment operation, and provide users with timely and accurate technical support.

DEAR Air Separation Solve YourPrecautions for installation of pipelines in air separation towerYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
In case of sudden power failure during the operation of small air separation unit, the following steps should be followed:   First, open the vent valve (anti surge valve) of air compressor to prevent the air compressor from surging and causing the air compressor to reverse due to air backflow;   Then check whether the molecular sieve adsorber switch should be interlocked to close, if not, it should be man...
2024.11.21
How is the ratio of individual gases adjusted in an air separation plant?
2024.11.20
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top