One failure was caused by a pressure-bearing problem in the pipe, which led to bursting and weighing problems, which in turn led to collapse.
The gas circulation liquefaction system is equipped with two channel hall gauges between the gas circulation liquefaction system and the main heat exc
There are three types of failure, primary failure, secondary failure and stiffness failure, all three of which are possible for buried pipes, and prim
The air exits the purification system and enters the main heat exchanger in the cold box, where it is cooled to the dew point by the fluid brought out
The part of the orifice is not a problem for equipment that is loaded beyond the permissible range, and the calculation looks at the displacement and
After the air has been cooled out of the water the compressed air enters the purifier and then passes through the adsorption drum, the remaining water
Visual, graphical, formula and computer analysis methods are used to determine the design conditions according to the medium to be transported, the op
After the air enters the air-cooled tower, the air exchanges substances with the ambient circulating water in the lower part of the air-cooled tower,
Ensure that pipeline stresses are within the permissible limits of the code, that equipment shut-off loads meet the manufacturer's requirements or rec
The air is drawn in by the air compressor after passing through a self-cleaning air filter, which removes most of the mechanical impurities such as du
The secondary stress calculation is mainly to prevent the pipe from collapsing during installation, while the secondary stress calculation is to preve
Oxygen and nitrogen double internal compression, oxygen and nitrogen for the internal booster form, improve the safety of the device occupies a small