1) All production materials (materials that can be reflected in the budget table and drawings) shall accurately put forward the overall supply application plan at one time before entering the site, that is, the principle of "one-time plan and batch purchase".
2) Confirm with the owner the mobilization plan and parameters of all materials and equipment provided by Party A, and draw a table.
3) The on-site material management department shall prepare the material procurement and supply plan according to the general production plan, personnel mobilization plan and the general supply application plan of various materials, which shall be approved by the project manager.
4) Prepare for the storage of various materials, the loading and unloading of heavy materials and prefabricated parts, and prepare the corresponding lifting operation plan and plan; For equipment operation related to the owner, the lifting operation scheme and plan shall be submitted to the owner, the owner and the supervisor for review and confirmation.
5) According to the material management system of the unit and the material management system of the project, prepare the material management plan and scheme.