The following two situations are common in the water inflow of the cooler (or switching heat exchanger:1) The water level of the air cooling tower of ...
Answer: when the main cooling is seriously leaked, nitrogen with higher pressure will leak into the low pressure oxygen side in large quantities, then...
"One Tree and one Bodhi, one sand and one world ". Everything in life is originally composed of details, and details are often the easiest t...
The start-up phase of the whole low-pressure oxygen generator is that liquid empty appears first in the lower tower, and then liquid oxygen appears in...
Saturation temperature and saturation pressure are terms in gas-liquid equilibrium. If it is not filled with liquid in a sealed container, part of liq...
The load adjustment range of low pressure air separation plant is related to the adjustment performance of raw material air compressor, the adjustment...
Before starting, the following preparations should be made:1) Check whether the unit has the starting condition (including the reason of last stop and...
In the switching heat exchanger, moisture and carbon dioxide cannot be completely and thoroughly removed. Although the remaining amount is very small,...
Switching purification process air separation equipment refers to self-cleaning of moisture and carbon dioxide in the passageway of switching Plate-fi...
The three-point temperature of the low temperature of the air separation tower is: T3 temperature refers to the temperature before the high pressure a...
Argon arc welding will produce harmful gas and high frequency electricity in the welding process, so there are several protection and safety measures ...
At the beginning of starting the full low pressure oxygen generator, all the air entering the equipment is inflated through the expander, while the to...