Home / All Air Separation tags /

Air separation plant factory

Air separation plant factory
Air separation plant, DEAR air separation plant, has been focusing on air separation field for 16 years. Its main business includes air separation unit manufacturing, industrial gas investment, air separation unit maintenance, unit operation management, spare parts of air separation unit, biogas purification unit and gas recovery. DEAR air separation is committed to becoming a high-quality air separation plant in China.
News of Air separation plant factory
More
Aug 28, 2020
On August 27, Kaifeng DEAR air separation Industrial Co., Ltd. (hereinafter referred to as Kaifeng DEAR air separation) and Kaifeng Mobile jointly hel
Jun 17, 2020
On June 16, Kaifeng "5G + Industrial Internet" Innovation and Development Forum and Kaifeng Mobile 5G Ecological Partner Conference were held, and vic
Solutions of Air separation plant factory
More
Large air separation plant KDON-15000/35000 solution for metallurgical industry
DEAR air separation has cooperated with customers in metallurgical industry domestic and abroad in many projects, and has rich project experience. DEAR has continuously invested in the research and development of large-scale air separation plant. In view of different fields, DEAR combined with the characteristics of these industry, develops high-efficiency energy-saving air separation plant. DEAR air separation uses the rapid development of internet technology to establish a remote monitoring system to collect real-time operation data of each air separation plant, and provides the best suggestions for users by using big data analysis. The KDON-15000 / 35000 large scale air separation plant, cooperated with customers, has achieved rapid, stable and efficient operation, and highly affirmed by customer.
Large air separation plant KDON-16000/35000 solution for metallurgical industry
Metallurgical industry is an industry to develop metal mineral resources and produce various kinds of raw materials for metal products. With the progress of science and technology, the metallurgical industry has new requirements for the process, process, management and application research and development of air separation plant. The air separation plant also has the following development trends: first, large-scale and cluster; second, the core technology is gradually localization; third, refinement, which needs to develop high-efficiency energy-saving technology for different application fields; fourth, highly automated and intelligent, reduce manual operation as far as possible, and gradually establish a remote monitoring system by using the rapid development of internet technology to collect in real time according to the operation data of air separation plant, using big data analysis to provide the best suggestions for users, etc. KDON (Ar) - 16000 / 35000, a large scale air separat
Faq of Air separation plant factory
More
1. Before hoisting, check and confirm whether the crane body, crane legs, lifting rigging and wire rope meet the safety requirements and hoisting conditions. 2. The hanging points of hoisting facilities shall be confirmed to prevent deviation and inclination; steel wire rope or sling shall be used for protection of edges and corners; sling and U-ring shall be used for lifting objects. 3. The commander shall use inter-phone for command, and special personnel shall be assigned for command, and the personnel shall stand at the position where the lifting object can be fully observed; warning isolation shall be set up in the hoisting area, and no one shall stand under the lifting object. 4. For large-scale hoisting, the hoisting safety scheme shall be formulated in combination with the company's special operation system.
May 14, 2025
1. Adhere to the electrical professionals to work with certificates, non electrical professionals are not allowed to replace or repair any electrical components. 2. Establish the temporary electricity inspection system, inspect and irregularly inspect various lines and facilities on site according to the temporary power management regulations, and archive the inspection and spot check records. 3. The inspectors and operators must wear insulating rubber shoes and gloves according to the regulations; they must use special insulating tools for electricians. 4. The temporary distribution lines must be erected according to the specifications. The overhead lines must be insulated wires, plastic flexible wires, bundles of overhead laying and surface laying along the ground. 5. The erection and use of temporary electricity on the construction site must comply with the provisions of technical code for safety of temporary electricity on construction site (JGJ46-88). 6. Constructio
May 06, 2025
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top