当前位置: Home / Faq / Large air separation FAQ /

Piping in cold box

Piping in cold box
Apr 01, 2021
Author: DEAR AST

In order to reduce the cold loss caused by improper pipeline layout in the cold box, the following points should be paid attention to when piping in the cold box: 1. The pipelines should not touch each other, and the cold and hot pipes should not be too close to each other. 2. All kinds of liquid pipelines or cold pipes should be close to the internal cold container as far as possible, and the gas pipeline should be arranged outside the liquid pipeline. 3. There should be a certain distance between the gas pipeline and the wall of the cold insulation box. 4. Measures should be taken to prevent the increase of cooling loss due to the continuous gasification of liquid in the liquid discharge pipeline.

DEAR Air Separation Solve YourPiping in cold boxYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The non-power consuming option for liquid air separation plants can be used for full liquid air separation plants,where the produced liquid is sold off. This approach is currently available for most LNG receiving stations. For air separation units with a large cold capacity, the liquid air can be pressurised to 6baA in a vacuum storage tank, and then heat exchanged through a heat exchanger, instead of the air compressor, directly into the cold box for distillation. At the same time in the cold b...
2026.03.13
1. Before connecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering. 2. When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes. 3. The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.
2026.03.12
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top