1) Before entering the site, the project construction organization design shall be reviewed under the leadership of the technical director and submitted to the chief engineer for approval.
2) Before entering the site, organize all professional engineers to fully understand and digest the drawings, communicate with the owner, and fill in the relevant drawing review records and technical negotiation minutes.
3) Do a good job in site construction location survey, confirm and compare the drawings with the actual situation, adjust the construction drawings according to the site and communicate with the design.
4) Under the leadership of the technical director, the professional engineers organize the comprehensive coordination of the professional construction of the project, and carry out the spatial integration and construction organization according to the sequence of the pipeline system under the same principle.
5) According to the plan, consider the comprehensive adjustment of each specialty and draw the adjustment plan. According to the plan, draw the support and hanger comprehensive plan and space management layout.
6) Technical disclosure materials such as confidentiality, safety, quality and construction scheme required by the contents of the project of each specialty shall be prepared in advance.
7) Relevant forms of engineering and technical data of each specialty shall be prepared in advance, and the technical forms of each specialty shall be bound into a volume according to the corresponding format, so as to ensure that the forms of each specialty can be delivered simply after being filled in.