Home / All Air Separation tags /

China Air Separation Plant Co.

China Air Separation Plant Co.
News of China Air Separation Plant Co.
More
Sep 30, 2020
On September 24, a delegation from QinZhou Federation of Industry and Commerce of Guangxi province came to DEAR air separation for investigation and i
Aug 28, 2020
On August 27, Kaifeng DEAR air separation Industrial Co., Ltd. (hereinafter referred to as Kaifeng DEAR air separation) and Kaifeng Mobile jointly hel
Solutions of China Air Separation Plant Co.
More
Large air separation plant KDON (Ar)-12000/24000-400 solution for metallurgical industry
Metallurgical industry is an industry to develop metal mineral resources and produce various kinds of raw materials for metal products. With the progress of science and technology, the metallurgical industry has new requirements for the process, process, management and application research and development of air separation plant. For many years, DEAR air separation has provided a number of complete solutions for the metallurgical industry, relying on the deep understanding of the industry and excellent product quality to help the efficient development of the metallurgical industry. KDON (Ar) - 12000 / 24000-400, a large scale air separation plant cooperated by DEAR air separation company and customers, has realized the rapid, stable and efficient operation of the production process, which is highly affirmed by customers. It also provides strong technical and product support for customers to cope with the fierce market competition.
Small air separation plant KDON (Ar)-3500/2000-75 solution for oil industry
DEAR air separation has many years of air separation plant manufacturing experience and has provided many sets of air separation plant for different customers in the oil industry for many years. The KDON (Ar) - 3500 / 2000-75 small air separation plant project cooperated by DEAR air separation and customers has helped enterprises to build more high-performance and high-quality products, which has been praised by customers.
Faq of China Air Separation Plant Co.
More
In order to check the installation quality, deformation under low temperature and smooth condition of pipelines, valves and field installed air separation plant in air separation column, needs to be further tighten the flange bolts at low temperature. It is necessary to start freezing before filling the cold insulation box with cold insulation material, which is called naked cooling. During naked cooling, the rectification column, main condensing evaporator and other main equipment shall be cooled to the minimum temperature for 2 hours respectively, and then the whole air separation unit shall be cooled for 3 to 4 hours. The deformation and leakage of each part shall be checked in detail, and the flange bolts shall be tightened again. After defrosting, the flange shall be heated to normal temperature before gas seal test can be conducted.
Nov 07, 2024
With the development of social economy, the air separation plant becomes larger. The scale of air compressor, supercharger and other units of large air separation plant is increasing. Taking the air compressor as an example, power of the main motor has reached more than 30000 kw. For the different power grid conditions, motor configuration and motor starting mode of different users, the related electronic control design technology of air separation plant has been improved correspondingly. Here is a brief introduction to the starting mode of air compressor motor.
Jun 13, 2024
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top