Home / All Air Separation tags /

Air separation unit maintenance work

Air separation unit maintenance work
Generally speaking, the scope of air separation unit maintenance mainly includes the inspection of existing problems and potential safety hazards. When carefully analyzing the causes of failure or damage, the feasible scheme is put forward according to the latest technical standards. At the same time, the maintenance plan should make full use of the original pipe section and support, reduce the cutting and welding workload, and shorten the maintenance period.
Faq of Air separation unit maintenance work
More
When the air separation unit is in normal operation, the liquid flows down and can only flow on the tray and flow to the lower tray through the overflow bucket because the supporting force of the rising steam prevents the liquid from flowing down from the small hole of the tray. After shutdown, due to the interruption of rising gas flow, the liquid on the tray can flow from the overflow bucket to the lower tray, and also can flow through the small hole on the tray to the lower tray. This will cause the surface of liquid oxygen and liquid air rise, which may exceed the position of the expansion air outlet pipe, resulting in liquid carrying accident of the expander during restart. Therefore, pay attention to the liquid level position when stopping.
Apr 08, 2026
1. Before connecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering. 2. When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes. 3. The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.
Mar 12, 2026
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top