Maintain sufficient stability of the pipeline being erected, not to be shaken at will, while taking into account the thermal expansion and contraction
Valve installation pay attention to the direction of the arrow and process requirements of the media flow direction, to avoid the wrong installation,
The sealing plate and pure nitrogen outlet cap at the upper end of the upper step, the crude argon outlet cap of the crude argon tower condenser must
Installation units should have the appropriate level of pressure piping installation qualification, to undertake pressure vessels, pressure piping por
Membrane separation technology is a technology that uses separation membranes as the core for the selective separation and concentration and purificat
Gas-liquid separation is one of the simplest and most productive methods of gas pretreatment. In order to eliminate the possible influence of liquid o
The characteristics of VPS are: short start-up and shut-down times, automation, simple process operation, low investment in equipment and low energy c
Variable Pressure Adsorption Oxygen PSA,VPSA, small investment, for oxygen-enriched glass kiln oxygen characteristics, VPSA technology is ideal for th
In the installation of cold box panels, two adjacent sides can be pre-assembled on the ground as a whole or angle type, with a thin steel plate liner
The main standard content of air separation installation involves, technical specifications for the installation of large air separation equipment, we
The return expansion double tower double condensing with circulating nitrogen pump oxygen tower nitrogen production flow is also suitable for nitrogen
The installation of large air separation equipment when the air separation equipment design and manufacturing and drive the important link between the