Home / All Air Separation tags /

Biogas purification training

Biogas purification training
Faq of Biogas purification training
More
Before the air cooling columnand water cooling columnare hoisted in place, the anchor hole shall be cleaned, and there shall be no water and debris in the anchor hole.   After the air cooling columnand water cooling columnare hoisted in place, the perpendicularity of the equipment shall be checked. The perpendicularity shall be ≤ 1/1000 and the total length shall not exceed 10mm.   The bottom of the anchor bolt shall not touch the bottom of the reserved anchor hole. Af...
Sep 03, 2026
What are biogas purification technologies
Sep 02, 2026
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top